Digital Construction Implementation in the Era of Industrial Revolution 4.0 Using Augmented Reality Technology to Determine Building Coordinates

Arif Widayanto, A Antonius, Moh Faiqun Niam

Abstract


The Industry revolution 4.0 has become a prominent topic of discussion, emphasizing the need to harness digital technology to enhance various aspects of human work, including the construction industry. In the field of construction, Building Information Modeling (BIM) has been widely adopted as a guiding framework for construction processes. Additionally, Augmented Reality (AR) technology has emerged as a powerful tool for bringing 3D models into the physical world. This research employs a qualitative approach, utilizing 3D design data of Pile Caps in the construction of the IKN Minister's Residence and Solo - Yogyakarta Toll Road Office. A total of 74 and 68 coordinate points were extracted from each design to analyze the discrepancies resulting from the implementation of AR technology. The findings reveal that both designs exhibited a margin of error of 0.6148648649 % for the IKN Minister's Residence and 0.6102941177 % for the Solo - Yogyakarta Toll Road Office, both of which fall below the 1% threshold for maximum allowable error.

Keywords


Surveying; Augmented Reality; Building Information Modeling

Full Text:

PDF

References


Harahap, N.J., Rafika.M. (2020). Industrial Revolution 4.0: and The Impact On Human Resources. Jurnal Ecobisma, Vol 7, Nomor 1, 2020.

Minawati, R., Chandra, H. P., & Nugraha, P. (2017). Manfaat Penggunaan Software Tekla Building Information Modeling (Bim) Pada Proyek Design-Build. Dimensi Utama Teknik Sipil, 4(2), 8-15.

McClean, E. (2013). An Augmented Reality System for Urban Environments using a Planar Building Facade Model. National University of Ireland Maynooth, Department of Computer Science, 72.

Shwab, K. (2016). The Fourth Industrial Revolution. New York: Crown Business.

Purnaditya, N.P. (2021). Ilmu Ukur Tanah - Konsep Dasar Surveying. Modul Kuliah Jurusan Teknik Sipil FT Universitas Sultan Ageng Tirtayasa.

Berlian, C.A., Adhi, R.P., Hidayat, A., dan Nugroho, H. (2016). Perbandingan efisiensi waktu, biaya, dan sumber daya manusia antara metode Building Information Modelling (BIM) dan konvensional (Studi kasus: perencanaan gedung 20 lantai), Jurnal Teknik Universitas Diponegoro, 5, 220-229.

Lotlikar, T., Mahajan, D., Khan, J., Ranadive, R., & Sharma, S. (2013). Augmented Reality-An Emerging Technology. International Journal of Engineering Sciences & Research Technology.

Mulyana, Deddy. (2013). Metodologi Penelitian Kualitatif. Bandung: PT. Remaja Rosdakarya.

Wulansari, I. (2021). Literature Review Galat Dalam Pemodelan dan Peramalan. Jurnal Ilmiah Multidisiplin Indonesia (CITIZEN), Vol 1, No. 3, 2021.




DOI: https://dx.doi.org/10.30659/jacee.7.2.143-154

Refbacks

  • There are currently no refbacks.


situs slot gacor

kasih777

manilabet365

bandar togel

wazeslot

wazeslot

iramatogel

pakbos188

slot

Slot Gacor Hari ini

Link Gacor

https://iso777.com

https://ccresourcecenter.org/contact-us/

toto slot 5k

situs

situs toto 5k

slot gacor 5k

slot qris

judi bola

slot gacor

slot gacor

top4d

senangslot

https://restoranpagisore.com/

slot gacor

kingliga

https://www.bjartlif.is/undirbladsidur

slot88

mayong77

mayong77

mayong77

mayong77

slot togel

slot

slot

https://cropgeneticsinnovation.org/

toto

bonus new member 100

agen bola

bandar slot gacor