Evaluation of The Implementation of Quality Management, Costs and Time in The Process of Self-Managed Project Development (Study on House Building Projects Muhammadiyah University Semarang Hospital)

M Martomo, Henny Pratiwi Adi, Kartono Wibowo

Abstract


The construction of Universitas Muhammadiyah Semarang (Unimus) Hospital employs a self-management approach. During the construction phase, delays and a decline in building quality that did not align with the planning phase were observed. Therefore, a review of the management approach is necessary to ensure timely completion, maintained quality, and cost efficiency. This study evaluates the effectiveness of time, cost, and quality management in the construction project. The analysis method used is the interactive data analysis paradigm, involving data reduction, storage, and analysis using IBM SPSS 20. The analysis results indicate that time and cost management have been effective, with the construction work being completed within the set schedule and the costs not exceeding the Budget Plan. Quality management is rated very good with a score of 4.35, indicating that the construction process is strictly carried out according to specified materials and work procedures. Cost savings are also rated very good with a score of 3.89, indicating effective cost control. Time efficiency is rated good with a score of 4.06, showing that the project can run the schedule efficiently. Based on the research results, the researcher recommends enhancing leadership aspects and increasing active involvement of top management in supervision and strategic decision-making. This study also shows that self-management can promote transparency, efficiency, and high-quality outcomes in construction projects.


Keywords


Cost; Management; Quality; Self-Management; Time

References


Mahyuddin, et al. (2023). Manajemen Proyek Konstruksi.

Budiman, H. (2010). Analisa prosedur pelaksanaan pada proyek swakelola.

Widiasanti, I., & Lenggogeni. (2013). Manajemen Konstruksi. Bandung: PT Remaja Rosdakarya.

Abrar, H. (2009). Manajemen Proyek. Edisi Revisi. Andi, Yogyakarta.

Norvita, M. (2018). Sistem pengawasan manajemen mutu dalam pelaksanaan proyek konstruksi (Studi kasus: Pembangunan gedung laboratorium Fakultas Teknik Unsrat). Jurnal Sipil Statistik, 6(1079-1084).

Hughes, B., & McGraw-Hill, C. (2002). Software Project Management (Ed. Ke-3). London: McGraw-Hill.

Zuraidah, N., Purwanto, H., & Warti, A. (2022). Analisis manajemen proyek pembangunan rumah susun lanjutan di Desa Kenten Laut Provinsi Sumatera Selatan. Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja), 10(1), 21–30. https://doi.org/10.24929/ft.v10i1.1478

Peraturan Presiden Republik Indonesia. (2010). Perpres RI No. 54 Tahun 2010 tentang Pengadaan Barang/Jasa Pemerintah. http://dx.doi.org/10.1016/

Ramli, S. (2012). Swakelola DAK Pendidikan versus P54/2010, pengadaan barang/jasa.

Irdayani. (2016). Kendala proyek konstruksi yang dikerjakan swakelola. Jurnal Konstruksi, 8(1), 61–74.




DOI: http://dx.doi.org/10.30659/jacee.7.2.%25p

Refbacks

  • There are currently no refbacks.


JACEE (Journal of Advanced Civil and Environmental Engineering)
is published by Fakultas Teknik Universitas Islam Sultan Agung, Indonesia, in collaboration with Federation Internationale du Beton (fib).
Jl. Raya Kaligawe Km.4, PO BOX 1054/SM Semarang 50112
Website: https://ft.unissula.ac.id/
Email: jacee@unissula.ac.id

ISSN: 2599-3356 (Online)
DOI : 10.30659/jacee

This work is licensed under a Creative Commons Attribution 4.0 International License

Get a feed by atom here, RSS2 here and OAI Links here

slot88dana4d