Saguling Reservoir is a reservoir located in West Bandung Regency, West Java Province at an altitude of 643 m above sea level. The pool area of this reservoir is around 5,606 ha with an initial storage volume of 875 million m3 of water. Several studies have been carried out regarding the plan to build Floating Photovoltaics (FPV) power plant on this reservoir. However, the results of this research are still felt to be less practical because they still use manual tools and use old technology. Therefore, it is very important to be able to develop a floating PV cell that is reliable, environmentally friendly, affordable and IoT-based, by paying attention to existing regulations. The aim of this research is to create a FPV cell design and analyze the potential for new renewable energy produced from IoT-based PV cell, useful for the development of environmentally friendly AC electrical energy. The method used is the quantitative analysis design, using IoT Blynk application. The floating solar power plant design is carried out at the reservoir location, taking into account rainfall, temperature, humidity, and solar energy potential from time to time in 1 full year. Data processing is carried out by means of quantitative analysis. For a 1 ha area, FPV have potential development results of 1.04 MWp. The PV cell capacity obtained from the development of the FPV design in the Saguling Reservoir is 1,165.82 MWp

Keywords: Floating Photovoltaics, IoT, Dam, Energy

 

ABSTRAK

Waduk Saguling merupakan waduk yang terletak di Kabupaten Bandung Barat, Provinsi Jawa Barat pada ketinggian 643 m di atas permukaan laut. Luas genangan waduk ini sekitar 5.606 ha dengan volume tampungan awal air sebesar 875 juta m3. Beberapa kajian telah dilakukan terkait rencana pembangunan pembangkit listrik Floating Photovoltaics (FPV) di waduk ini. Namun hasil penelitian tersebut masih dirasa kurang praktis karena masih menggunakan alat manual dan menggunakan teknologi lama. Oleh karena itu, sangat penting untuk dapat mengembangkan sel PV terapung yang andal, ramah lingkungan, terjangkau, dan berbasis IoT, dengan memperhatikan regulasi yang ada. Tujuan dari penelitian ini adalah untuk membuat desain sel FPV dan menganalisis potensi energi baru terbarukan yang dihasilkan dari sel PV berbasis IoT, berguna untuk pengembangan energi listrik AC yang ramah lingkungan. Metode yang digunakan adalah desain analisis kuantitatif, dengan menggunakan aplikasi IoT Blynk. Perancangan PLTS terapung ini dilakukan di lokasi waduk dengan mempertimbangkan curah hujan, suhu, kelembaban, dan potensi energi matahari dari waktu ke waktu dalam 1 tahun penuh. Pengolahan data dilakukan dengan cara analisis kuantitatif. Untuk lahan seluas 1 ha, FPV mempunyai potensi hasil pengembangan sebesar 1,04 MWp. Kapasitas sel PV yang diperoleh dari pengembangan desain FPV di Waduk Saguling adalah 1.165,82 MWp.

Kata Kunci: Fotovoltaik Terapung, IoT, Dam, Energi

Author Biography

  • Agung Wahyudi Biantoro, Department of Civil Engineering, Universitas Mercu Buana
    Civil Engineering Department

References

Biantoro, A. W., Iskendar, I., Subekti, S., & Noor, N. bin M. (2021). The Effects of Water Debit and Number of Blades on The Power Generated of Prototype Turbines Propeller as Renewable Electricity. Jurnal Rekayasa Mesin, 12(1), 203–215.

Biantoro, A. W., Wahyudi, S. I., & Niam, M. F. (2022). New Method for Floods Early Detection using some Sensors based on IoT Technology. ARPN Journal of Engineering and Applied Sciences, 17(14), 1429–1436.

Biantoro, A. W., Wahyudi, S. I., Niam, M. F., & Mahardika, A. G. (2022). Analysis of Ciliwung river flood debit and city flood anticipation using floods early detection system (FEDS). IOP Conference Series: Earth and Environmental Science, 955(1), 1–12. https://doi.org/10.1088/1755-1315/955/1/012011

Diniardi, E. A., Hariyadi, W. F., Iqbal, M., Syaifullah, M. F., Dewantara, P. W., & Febriani, S. D. A. (2022). Perencanaan Survey Sebaran Potensi Energi Terbarukan pada Pembangkit Listrik Tenaga Surya (PLTS) Terapung Provinsi Jawa Barat Berbasis Visualisasi dan Layouting Peta Qgis 3.16. Eksergi: Jurnal Teknik Energi, 18(1), 85–101.

El Islamy, H. A., & Aryawan, W. D. (2018). Desain Pembangkit Listrik Tenaga Surya Apung untuk Wilayah Kepulauan Selayar , Sulawesi Selatan. Jurnal Teknik ITS, 7(2), G161–G166.

Herlambang, Y. D., Prasetiyo, B., Wahyono, Apriandi, N., & Sutanto, B. (2023). Unjukkerja Panel Surya Tipe Terapung untuk Pembangkit Listrik. Jurnal Rekayasa Mesin, 18(3), 435–444.

Hidayat, A., Basysyar, B., Alkhaly, Y. R., & Bin Ali, M. N. (2022). Analysis of Flood Peaks Using The Mean Annual Flood Method. International Journal of Engineering, Science and Information Technology (IJESTY), 2(2), 53–59. https://doi.org/10.52088/ijesty.v2i2.249

Hidayat, A., Ramdani, S. A., & Romadhoni, S. L. (2022). Pembangunan Pembangkit Listrik Tenaga Surya di Waduk Cirata, Kabupaten Purwakarta. JIP (Jurnal Inovasi Penelitian), 3(6), 6701–6706.

Inayah, I., Hayati, N., Nurcholis, A., Dimyati, A., & Prasetya, M. G. (2022). Realtime Monitoring System of Solar Panel Performance Based on Internet of Things Using Blynk Application. ELINVO (Electronics, Informatics, and Vocational Education), 7(2), 135–143. https://doi.org/https://doi.org/10.21831/elinvo.v7i2.53365 Realtime

Junianto, B., Dewi, T., & Sitompul, C. R. (2020). Development and Feasibility Analysis of Floating Solar Panel Application in Palembang, South Sumatra. Journal of Physics: Conference Series, 1500(1). https://doi.org/10.1088/1742-6596/1500/1/012016

Kim, S. H., Yoon, S. J., Choi, W., & Choi, K. B. (2016). Application of floating photovoltaic energy generation systems in South Korea. Sustainability (Switzerland), 8(12), 1–9. https://doi.org/10.3390/su8121333

Kodoatie, R. J. (2013). Rekayasa dan Manajemen Banjir Kota (3rd ed.). Andi.

Laksana, K. C. Y., Giriantari, I. A. D., & Sukerayasa, I. . (2023). Perancangan PLTS Terapung untuk Mendukung Wisata Hijau di Bendungan Tamblang, Desa Sawan, Kabupaten Buleleng. Jurnal Spektrum, 10(3), 38–45.

Loebis, J. (1992). Banjir Rencana untuk Bangunan Air, Departemen Pekerjaan Umum. Badan Penerbit Pekerjaan Umum.

Muchtar, G. M., Hardi, S., & Rohana. (2023). Desain Pembangkit Listrik Tenaga Surya (PLTS) Terapung pada Regulating Pond Aplikasi pada PLTA Renun UPDK Pandan PLN Kitsbu. JESCE (Journal of Electrical and System Control Engineering), 6(2), 59–65. https://doi.org/10.31289/jesce.v6i2.8198

Nurjaman, H. B., & Purnama, T. (2022). Pembangkit Listrik Tenaga Surya (PLTS) Sebagai Solusi Energi Terbarukan Rumah Tangga. JEE (Jurnal Edukasi Elektro), 06(02), 136–142.

Permana, H. S., Hadiani, R., & Solichin, S. (2019). Pemanfaatan Waduk Bening/ Widas Sebagai Lokasi Pembangkit Listrik Tenaga Surya (Plts). Jurnal Riset Rekayasa Sipil, 2(2), 65. https://doi.org/10.20961/jrrs.v2i2.28630

Rinaldi, A., & Mulyono, J. (2021). Peluang Pembangkit Listrik Tenaga Surya (PLTS) Pada Genangan Waduk. Jurnal Infrastruktur, 7(1), 106–113. http://journal.um-surabaya.ac.id/index.php/JKM/article/view/2203

Risnawati. (2013). Perencanaan Dan Desain Saluran Drainase Kawasan Perumahan Mulawarman Residence Kota Samarinda Pada Segmen Ii. Jurnal Teknik Sipil UNTAG Samarinda, 53(9), 1689–1699.

Safitri, A., Wahyudi, S. I., & Soedarsono. (2020). Simulation of Transmission of Drinking Water Sources to Reservoirs: Case Study PDAM Tirta Jati, Cirebon, Indonesia. IOP Conference Series: Earth and Environmental Science, 498(1). https://doi.org/10.1088/1755-1315/498/1/012072

Sebayang, I. S. D., Hidayat, A., & Indah, N. (2018). Identification of Renewable Energy Potential in Identification of Renewable Energy Potential in Ciberang River , Cisarua Village , Bogor , West Java. IOP Conf. Series: Materials Science and Engineering, 343, 1–8. https://doi.org/10.1088/1757-899X/343/1/012029

Siregar, A. M., Syahtaria, M. I., & Laksmono, R. (2022). Pengembangan Pembangkit Listrik Tenaga Surya (PLTS) di Kota Sibolga dalam Rangka Mendukung Ketahanan Energi Daerah. Jurnal Ketahanan Energi, 8(1), 12–31.

Downloads

Published

2024-10-01