Cost Modeling of Road Maintenance Using the Cost Significant Method in Disaster Prone Areas of Solok Regency
DOI:
https://doi.org/10.30659/jacee.9.1.29-42Kata Kunci:
Cost significant model, Cost estimation, Cost estimation model, road maintenance in regency, Solok RegencyAbstrak
This study aims to develop cost model for a periodic road maintenance project. The background is the lack of a simple and accurate calculation method to estimate the cost of the work. The model was developed using the Cost Significant Model (CSM) method and multiple linear regression, using historical data of periodic road maintenance work contracts at the Public Works and Spatial Planning Agency (DPUPR) of Solok Regency for the period 2018–2023. The analysis results show that the most significant work on the project cost is K-175 shoulder concrete, Class A Aggregate Foundation Layer (LPA), and Asphalt Concrete-Wearing Course (AC-WC). The resulting cost estimation model is Y = 4,531.24 + 1.19 X₁₄ + 1.35 X₁₅ + 1.43 X₁₉, with Y as the project cost per m², X₁₄ the price of K-175 shoulder concrete per m², X₁₅ the price of Class A LPA per m², and X₁₉ the price of AC-WC per m². This model has an average CMF value of 1.004 and a model deviation of 2.965%, much more accurate than the estimation method currently used by the Highways Division of the DPUPR of Solok Regency which has an average deviation of 29.951%. Thus, the developed CSM model is proven to be more accurate and suitable for estimating the costs of periodic road maintenance projects in Solok Regency.
Referensi
Amin, M., Tamima, U., & Amador, L. (2020). Towards resilient roads to storm-surge flooding: case study of Bangladesh. International Journal of Pavement Engineering, 21, 63 - 73. https://doi.org/10.1080/10298436.2018.1436706
Batista, E., De Brum Passini, L., & Kormann, A. (2019). Methodologies of Economic Measurement and Vulnerability Assessment for Application in Landslide Risk Analysis in a Highway Domain Strip: A Case Study in the Serra Pelada Region (Brazil). Sustainability. https://doi.org/10.3390/su11216130.
Donal, R. (2014). Pemodelan Estimasi Biaya Awal Proyek Rekonstruksi Jalan Dengan Metode Cost Significant Model “Studi Kasus Paket Rekonstruksi Jalan Nasional Wilayah II Sumatera Barat. Tesis Program Magister Teknik Sipil-Fakultas Teknik-Unand” https://scholar.unand.ac.id/13007/
Flores, V., & Ascaño, G. (2025). Quantitative Risk Analysis Framework for Cost and Time Estimation in Road Infrastructure Projects. Infrastructures. https://doi.org/10.3390/infrastructures10060139.
Ferlisi, S., Marchese, A., & Peduto, D. (2020). Quantitative analysis of the risk to road networks exposed to slow-moving landslides: a case study in the Campania region (southern Italy). Landslides, 18, 303-319. https://doi.org/10.1007/s10346-020-01482-8.
Koks, E., Koks, E., Rozenberg, J., Zorn, C., Tariverdi, M., Vousdoukas, M., Fraser, S., Hall, J., & Hallegatte, S. (2019). A global multi-hazard risk analysis of road and railway infrastructure assets. Nature Communications, 10. https://doi.org/10.1038/s41467-019-10442-3.
Liu, M., & Luo, M. (2023). Cost estimation model of prefabricated construction for general contractors based on system dynamics. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ecam-03-2023-0304.
Muttaqin, Z., Sugiarto, S., & Saleh, S. (2024). Developing a cost estimation model for efficient road improvement planning: A case study in Aceh Jaya regency. IOP Conference Series: Earth and Environmental Science, 1356. https://doi.org/10.1088/1755-1315/1356/1/012079.
Oktavia, L. S., Aldina, L., Nurdiyanto, & Yulaeli, T. (2023). Faktor-faktor yang mempengaruhi Nilai Waktu Uang: Future Value, Present Value, dan Annuity. Jurnal Publikasi Ilmu Manajemen (JUPIMAN), 2(3), 153–168. https://doi.org/10.55606/jupiman.v2i2.206.
Postance, B., Hillier, J., Dijkstra, T., & Dixon, N. (2017). Extending natural hazard impacts: an assessment of landslide disruptions on a national road transportation network. Environmental Research Letters, 12. https://doi.org/10.1088/1748-9326/aa5555.
Petroutsatou, K., Vagdatli, T., & Maravas, A. (2023). Probabilistic approach of pre-estimating life-cycle costs of road tunnels. Structure and Infrastructure Engineering, 20, 1896 - 1911. https://doi.org/10.1080/15732479.2023.2165120.
Rezvani, S., Silva, M., & De Almeida, N. (2024). Urban Resilience Index for Critical Infrastructure: A Scenario-Based Approach to Disaster Risk Reduction in Road Networks. Sustainability. https://doi.org/10.3390/su16104143.
Sayed, M., Abdel-Hamid, M., & El-Dash, K. (2020). Improving cost estimation in construction projects. International Journal of Construction Management, 23, 135 - 143. https://doi.org/10.1080/15623599.2020.1853657.
Salindeho, B., Dundu, A. K. T., & Supit, C. J. (2022). Model Estimasi Kontruksi Jalan Dengan Metode Cost Significant Model (Studi Kasus Pada Konstruksi Jalan di Manado). 12(3), 191–204. https://ejournal.unsrat.ac.id/v3/index.php/jime/article/view/46687
Falahis, V. D., Sugiyarto., Laksito, B. (2015). Cost Significant Model Sebagai Dasar Pemodelan Estimasi Biaya Konstruk Jembatan Beton Bertulang. e-Jurnal Matriks Teknik Sipil, 957–964.https://doi.org/10.20961/mateksi.v3i4.37224
Sugiyarto, Muali, A., Hartono, W. (2016). Estimasi Biaya Konstruksi Bangunan Gedung Dengan Metode Cost Significant Model. e- Jurnal Matriks Teknik Sipil, 498. https://doi.org/10.20961/mateksi.v4i2.37005
Wang, N., & Horner, M. (2007). CSI model for estimating road maintenance projects. Construction Management and Economics, 25, 1269 - 1281. https://doi.org/10.1080/01446190701670373.
Unduhan
Diterbitkan
Terbitan
Bagian
Lisensi
The copyright of the received article shall be assigned to the journal as the publisher of the journal. The intended copyright includes the right to publish the article in various forms (including reprints). The journal maintains the publishing rights to the published articles.

This work is licensed under a Creative Commons Attribution 4.0 International License.