Supply Chain in the Construction Industry: Micro, Meso, Macro
DOI:
https://doi.org/10.30659/jacee.3.2.50-57Keywords:
supply chain, construction, micro, meso, macroAbstract
The construction industry is so fragmented that in its implementation many have resulted in increased costs, delays, and inefficiencies. But this fragmented can not be a reason not to innovate. One approach to the solution used is supply chain construction. The purpose of this study is to map supply chains micro, meso, and macro. This level is tiered from the bottom to the top level as the concept of supply chain management. The qualitative and quantitative research method was used to map and analyze supply chains for each level. The results showed the micro-level is the basis of the supply chain which can be measured by SCOR for example. The meso level focuses on the strength of construction companies. Construction company strategies framework contract and Enterprises Resource Planning (ERP). Macro-level includes supply chain accumulation from micro and meso. It is expected that at the macro level is the harmonization of supply chains between stakeholders, namely the government, contractors, suppliers, and distributors with good policy regulations.Downloads
Published
Issue
Section
License
The copyright of the received article shall be assigned to the journal as the publisher of the journal. The intended copyright includes the right to publish the article in various forms (including reprints). The journal maintains the publishing rights to the published articles.

This work is licensed under a Creative Commons Attribution 4.0 International License.

