Evaluation of The Implementation of Quality Management, Costs and Time in The Process of Self-Managed Project Development (Study on House Building Projects Muhammadiyah University Semarang Hospital)

M Martomo, Henny Pratiwi Adi, Kartono Wibowo

Abstract


The construction of Universitas Muhammadiyah Semarang (Unimus) Hospital employs a self-management approach. During the construction phase, delays and a decline in building quality that did not align with the planning phase were observed. Therefore, a review of the management approach is necessary to ensure timely completion, maintained quality, and cost efficiency. This study evaluates the effectiveness of time, cost, and quality management in the construction project. The analysis method used is the interactive data analysis paradigm, involving data reduction, storage, and analysis using IBM SPSS 20. The analysis results indicate that time and cost management have been effective, with the construction work being completed within the set schedule and the costs not exceeding the Budget Plan. Quality management is rated very good with a score of 4.35, indicating that the construction process is strictly carried out according to specified materials and work procedures. Cost savings are also rated very good with a score of 3.89, indicating effective cost control. Time efficiency is rated good with a score of 4.06, showing that the project can run the schedule efficiently. Based on the research results, the researcher recommends enhancing leadership aspects and increasing active involvement of top management in supervision and strategic decision-making. This study also shows that self-management can promote transparency, efficiency, and high-quality outcomes in construction projects.


Keywords


Cost; Management; Quality; Self-Management; Time

Full Text:

PDF

References


Mahyuddin, et al. (2023). Manajemen Proyek Konstruksi.

Budiman, H. (2010). Analisa prosedur pelaksanaan pada proyek swakelola.

Widiasanti, I., & Lenggogeni. (2013). Manajemen Konstruksi. Bandung: PT Remaja Rosdakarya.

Abrar, H. (2009). Manajemen Proyek. Edisi Revisi. Andi, Yogyakarta.

Norvita, M. (2018). Sistem pengawasan manajemen mutu dalam pelaksanaan proyek konstruksi (Studi kasus: Pembangunan gedung laboratorium Fakultas Teknik Unsrat). Jurnal Sipil Statistik, 6(1079-1084).

Hughes, B., & McGraw-Hill, C. (2002). Software Project Management (Ed. Ke-3). London: McGraw-Hill.

Zuraidah, N., Purwanto, H., & Warti, A. (2022). Analisis manajemen proyek pembangunan rumah susun lanjutan di Desa Kenten Laut Provinsi Sumatera Selatan. Jurnal Ilmiah MITSU (Media Informasi Teknik Sipil Universitas Wiraraja), 10(1), 21–30. https://doi.org/10.24929/ft.v10i1.1478

Peraturan Presiden Republik Indonesia. (2010). Perpres RI No. 54 Tahun 2010 tentang Pengadaan Barang/Jasa Pemerintah. https://dx.doi.org/10.1016/

Ramli, S. (2012). Swakelola DAK Pendidikan versus P54/2010, pengadaan barang/jasa.

Irdayani. (2016). Kendala proyek konstruksi yang dikerjakan swakelola. Jurnal Konstruksi, 8(1), 61–74.




DOI: https://dx.doi.org/10.30659/jacee.7.2.184-198

Refbacks

  • There are currently no refbacks.


situs slot gacor

kasih777

manilabet365

bandar togel

wazeslot

wazeslot

iramatogel

pakbos188

slot

Slot Gacor Hari ini

Link Gacor

https://iso777.com

https://ccresourcecenter.org/contact-us/

toto slot 5k

situs

situs toto 5k

slot gacor 5k

slot qris

judi bola

slot gacor

slot gacor

top4d

senangslot

https://restoranpagisore.com/

slot gacor

kingliga

https://www.bjartlif.is/undirbladsidur

slot88

mayong77

mayong77

mayong77

mayong77

slot togel

slot

slot

https://cropgeneticsinnovation.org/

toto

bonus new member 100

agen bola

bandar slot gacor

indobolaku

SLOT TOTO