Juridical Study of Agreements Between Developers and Home Buyers in Failed to Build Issues

Nur Amanah Yuliani, Siti Rodhiyah Dwi Istinah

Abstract


The purpose of this study is to analyze: 1). Implementation of the agreement between the developer and the buyer of the house in the problem of failing to build in Pemalang City at this time. 2). Implementation of the agreement between the developer and the buyer of the house in the case of failing to build in Pemalang City, which should be. The approach method in this research is a normative juridical approach using a statutory approach and a conceptual approach. The secondary data used were obtained through literature study, data analysis was carried out using descriptive analytic. The results of the study concluded: 1). The problem of failure to build usually only arises when the object in the house sale and purchase agreement has been handed over, but it turns out that the quality is not as expected by the consumer or the environment where the house that is the object of the agreement is built is not in accordance with the agreement. This is actually something that needs to be looked at together both by the developer himself as a seller and by the consumer as a buyer. In addition, failure to wake up late is known when the handover of the house is carried out during the dry season and consumers only find out that there will be defects in the building during the rainy season. Even though the warranty period from the developer has expired. This problem is experienced by consumers from CV. Bima Abadi then filed a complaint to the developer about the problem. In the end, the matter was resolved amicably. The parties agree that the developer will bear the cost of destroying the building in half and the rest will be borne by the consumer. 2). The implementation of the agreement should be based on contractual liability (responsibility based on the agreement) as regulated in article 134 of Act No. 1 of 2011 concerning Housing and Settlement Areas which states that "Everyone is prohibited from carrying out housing construction, which does not build housing in accordance with the criteria as specifications, requirements, infrastructure, facilities, and public utilities that have been agreed. It is clear in Act No. 1 of 2011 concerning Housing and Settlement Areas in article 134, to provide protection for housing consumers for an agreement made with business actors, in this case housing developers.


Full Text:

PDF

References


Journals:

Anis Mashdurohatun. Penegakan Hukum Pidana Di Bidang Illegal Logging Bagi Kelestarian Lingkungan Hidup dan Upaya Penanggulangannya. Jurnal Hukum.Vol XXVI. No. 2. August 2011

Gunarto. Ansharullah Ida. Jelly Leviza. The 2nd Proceeding. Indonesia Clean of Corruption in 2020. Comparative Law System of Procurement of Goods Servisces around Countries in Asia. Australia and Europe. Unissula Pess. Semarang, 2016

Sri Endah Wahyuningsih dan Agus Sunaryo. The Role of Prosecutor Office In The Eradication Of Corruption Criminal Acts In Indonesia. Jurnal Pembaharuan Hukum. Volume IV No. 2 May - August 2017

Ong Argo Victoria, Ade Riusma Ariyana, Devina Arifani. (2020). Code of Ethics and Position of Notary in Indonesia. Sultan Agung Notary Law Review 2 (4), 397-407, http://lppm-unissula.com/jurnal.unissula.ac.id/index.php/SANLaR/article/view/13536

Books:

Achmad Busro, (2011), Hukum Perikatan Berdasar Buku III KUH Perdata, Yogyakarta: Percetakan Pohon Cahaya

Agus Salim. (2001). Teori dan Paradigma Penelitian Sosial. Dari Denzin Guba dan Penerapannya. Yogyakarta: Tiara wacana Yogya

Esmi Warassih, (2011), Pranata Hukum Sebuah Telaah Sosiologis, Semarang: Badan Penerbit Universitas Diponegoro

Jonaedi Efendi, (2018), Metode Penelitian Hukum Normatif dan Empiris, Jakarta: Prenada Media Group

R. Soeroso. (1993). Pengantar Ilmu Hukum. Jakarta: Sinar Grafika

Salim H. S., (2010), Perkembangan Teori Dalam Ilmu Hukum, Rajawali Pers: Jakarta

Salim, Abdulah, (2007), Perancangan kontrak & Memorandum of Understanding, Sinar Grafika: Jakarta

Internet:

https://jateng.inews.id/berita/diduga-gelapan-dana-bedah-rumah-head-dinas-perkim-pemalang-diamankan-polisi

https://www.jogloabang.com/library/uu-2-2017-jasa-construction

Regulation:

Act No. 18 of 1999 concerning Building Construction;

Act No. 2 of 2014 concerning the Position of a Notary;

Act No. 2 of 2017 During the First Amendment to Act No. 18 of 1999 concerning Building Construction;

Basic Agrarian Act No. 5 of 1960;

Code of Civil law.

Constitution of 1945 Republic of Indonesia;

Government Regulation Number 29 of 2000 concerning the Implementation of Building Construction Services


Refbacks

  • There are currently no refbacks.